You can always press Enter⏎ to continue
HP ALM/Quality Center Quiz
1
Instructions For Quiz
This Mock Test has 20 Questions
Each Question is of 1 marks so total 20 marks
Multiple Choice Questions(MCQ) with only ONE valid answer
Previous
Next
Submit
Press
Enter
2
1) Quality Center is
*
This field is required.
an ERP
a standalone software
a web based (client/server) tool
a script
Previous
Next
Submit
Press
Enter
3
2) Traceability Alert is depicted with a "@"
*
This field is required.
Yes
No
Previous
Next
Submit
Press
Enter
4
3) For Test Plan Module , select the correct folder hierarchy
*
This field is required.
Subject - Tests - Test Step
Subject - Test Steps - Step
Requirements - Tests - Test Steps
Requirements - Subject - Tests - Test Steps
Previous
Next
Submit
Press
Enter
5
4) Which Tab allows to configure conditional execution of Tests
*
This field is required.
Hint : Conditions like Test # 2 can be executed only if Test # 1 is completed
Execution Flow
Design
Attachments
None of The Above
Previous
Next
Submit
Press
Enter
6
5) Test Cases created in Word / Excel can be uploaded in QC ?
*
This field is required.
YES
NO
Previous
Next
Submit
Press
Enter
7
6) Types of Graphs available in QC
*
This field is required.
Reports
Graphs
Live Analysis Graphs
All Of the Above
Previous
Next
Submit
Press
Enter
8
7) Follow Up Alert can be created on
*
This field is required.
A Test in Test Plan Tree
A Test Instance in Execution Grid
A Defect in Defects Grid
All Of the Above
Previous
Next
Submit
Press
Enter
9
8) Favorites are almost always are High Priority Defects
*
This field is required.
Hint : User can mark a defect as favorite for easy tracking. A favorite can be PUBLIC or PRIVATE
Yes
No
Previous
Next
Submit
Press
Enter
10
9) In QC, Requirements & Test Plan can be linked ?
*
This field is required.
Only Child Requirements
Only Parent Requirements
Both Child & Parent Requirements
Niether Child nor Parent Requirements
Previous
Next
Submit
Press
Enter
11
10) In Test Lab Module , is it possible to store separate results for the SAME test case run at different dates and times ?
*
This field is required.
Yes
No
Previous
Next
Submit
Press
Enter
12
11) Which of the Below is NOT a module in Quality Center
*
This field is required.
Requirements
Business Component
Defects
Automation
Previous
Next
Submit
Press
Enter
13
12) Defect can be linked to
*
This field is required.
Tests & Test Steps
Run & Run Steps
Requirements
All Of the Above
Previous
Next
Submit
Press
Enter
14
13) Test Cases can be added in Test Lab Module from
*
This field is required.
Requirements Module
Defects Module
Test Plan Module
All Of the Above
Previous
Next
Submit
Press
Enter
15
14) Data is DYNAMICALLY updated in
*
This field is required.
Reports
Graphs
Live Analysis Graphs
None Of the Above
Previous
Next
Submit
Press
Enter
16
15) Is is possible to link a single defect to multiple test cases ?
*
This field is required.
Yes
No
Previous
Next
Submit
Press
Enter
17
16) Which Tests can be scheduled to be run at a specific Date and Time?
*
This field is required.
Manual Test Cases
Automated Test Cases
Both Manual & Automated Test Cases
Niether Manual nor Automated Test Cases
Previous
Next
Submit
Press
Enter
18
17) In Test Lab Module
*
This field is required.
Tests are created
Tests are executed
Tests are created and executed
Previous
Next
Submit
Press
Enter
19
18) Results of an AUTOMATED test case are stored in
*
This field is required.
Automation
Test Plan
Test Lab
None of The Above
Previous
Next
Submit
Press
Enter
20
19) An Instance is
*
This field is required.
A copy of the Requirement
A copy of Test Case
A Copy of Defect
A copy of Email
Previous
Next
Submit
Press
Enter
21
20) Quality Center is a
*
This field is required.
Defect Tracking Tool
Requirements Management Tool
Test Planning Tool
Comprehensive Test Management Tool
Previous
Next
Submit
Press
Enter
Should be Empty:
Question Label
1
of
21
See All
Go Back
Submit