• Section I – Basic Information for Empanelment

  • Basic Information

  • Basic details of the Training Centre

  • 8. Corporation / Municipality / Gram Panchayat*
  • Section II – Financial Details

  • Financial Details

  • Section III – Training (for specific Training Center)

  • Overall Training Details

  • A. Training Capacity*
  • Please share the number of trainees trained at the training centre in the 3 previous years

  • Mobilization Strategies

  • Placement Details

  • Please share the number of trainees placed from the training centre in the 3 previous years

  • Section III – Training Centre Details

  • General Infrastructure Details

  • Power Back-Up
  • Dedicated Toilets for each gender
  • Canteen
  • By Train
  • Training Infrastructure Details

  • 1. Class Room*
  • 2. Practical Labs
  • 3. Library
  • 4. Office Rooms
  • 5. Equipment Storage Room
  • Hostel Facilities

  • Hostel Facility
  • Mess Facility
  • Computer Lab

  • Computer Labs
  • Section IV – Trainer Details (for specific Training Center)

    (For Sectors not available in drop down list please enter the sector name on other Sector)
  • Sector wise data
  • Section V – Course Details (for specific Training Center)

    (For Sectors not available in drop down list please enter the sector name on other Sector)
  • Do you operate under any Govt. sponsored Schemes?
  • Table A1 – Fee-Based Courses (The Numbers pertain to only the specific training centre)
  • Table A2 – Fee-Based Courses (The Numbers pertain to only the specific training centre)
  • Instructions: For the same course but under two different Govt. Schemes, there must be two separate entries in the space given as illustrated below.
  • Table B – Govt. Scheme Sponsored Courses (The Numbers pertain to only the specific training centre)
  • Should be Empty: